Thane Metro Line 4 and 4A Phase 1 operations are scheduled to begin by the end of December, with the first stretch running between Gaimukh and Vijay Garden, covering four stations on Ghodbunder Road. This milestone marks a historic infrastructure achievement for Thane and the broader Mumbai Metropolitan Region.
The metro will slice travel times by up to 75%, helping residents completely bypass infamous bottlenecks like Teen Hath Naka and Kapurbawdi. The commissioning of Metro Line 4 and 4A will trigger a major modal shift from road transport to high-speed rail, significantly reducing traffic bottlenecks along Ghodbunder Road and LBS Marg, providing commuters with a safer, faster, and reliable transit alternative.
Commercial services will begin between Gaimukh and Vijay Garden, serving four major elevated stations: Gaimukh, Owale, Kasarvadavali, and Vijay Garden. Phase-1, stretching from Gaimukh to Cadbury Junction, covers 10.5 kilometers and includes 10 stations, with four stations ready for use by December 2025.
Once the full corridor becomes operational, Metro-4 will likely cut Thane–Wadala travel time by more than 50% for many commuters, depending on origin and destination points. By offering a comfortable, air-conditioned, and eco-friendly ride, the new line promises to lower pollution levels, reduce vehicle congestion on roads, and usher in a stress-free travel era for Thanekars.
In a significant step, MMRDA has completed the erection of a crucial 55-meter-long Special Steel Span on Ghodbunder Road, with the project coming under Metro Line 4 (Package CA-12), enabling Phase 1 commissioning. Another major span — a 48-metre, 325-tonne steel segment — was installed at Kapur Bawdi Junction on Ghodbunder Road, completing all special steel spans along the Thane stretch between Majiwada and Kasarvadavali.
To keep the metro accessible for daily commuters, ticket pricing will follow standard distance-based MMRDA fare rules, with single-journey fares beginning at ₹10 for 0-3 kilometers, ₹20 for 3-12 kilometers, and ₹30-₹40 for longer distances. Regular commuters will have access to monthly trip passes and contactless smart cards for hassle-free travel and discounted fares.
Indavara, Chikkamagaluru
Villas / Plots (Expected) • Price on Request
85-acre land bank entry into Chikkamagaluru
Bagalur, Bangalore
1, 2, 3 BHK (expected) • Price on Request
30+ acre land parcel acquired
Padi-Korattur, Chennai
2, 3 BHK, Office & Retail • Price on Request
16.38-acre mixed-use development
Sahar, Andheri East, Mumbai
Hotel, Office & Retail • GDV Rs 4,500 Cr
1.5 million sq ft integrated hospitality-commercial project
Aram Nagar, Versova, Mumbai
Configuration TBA • On Request
6-acre JV, 1.7 mn sq ft, Rs 9,000 Cr GDV
Bengaluru Airport City, Bangalore
Convention | Hospitality | Office | Retail • ₹1,800 Cr investment
1.5 million sq ft mixed-use destination
Bengaluru Airport City, Devanahalli, Bangalore
Hotels | Convention Centre | Office | Retail • Price on Request
₹1,800 Cr integrated destination at KIA
Budigere Cross, Bangalore
1, 2, 3 BHK • Price on request
Upcoming Prestige address off Old Madras Road
Content is provided strictly for information and does not constitute an offer, solicitation, or contractual commitment. Specifications, pricing, and availability may change at any time. Independent verification of all particulars is advised. About · Projects
Share your details and our expert will call you back.